Commit graph

4 commits

Author SHA1 Message Date
John MacFarlane
b8d460eeab Powerpoint writer: consolidate text runs when possible.
This slims down the output files by avoiding unnecessary
text run elements.

Updated golden tests.
2021-10-04 12:24:12 -07:00
John MacFarlane
82d587493d Revert "Powerpoint writer: consolidate text run nodes."
This reverts commit 62f83aa486.

This was already being done, it seems.
I misidentified the problem; it is really with `Str ""` nodes.
2021-10-04 11:50:32 -07:00
John MacFarlane
62f83aa486 Powerpoint writer: consolidate text run nodes.
This should reduce the size of the generated files.
2021-10-04 11:45:01 -07:00
Emily Bourke
50adea220d pptx: Support footers in the reference doc
In PowerPoint, it’s possible to specify footers across all slides,
containing a date (optionally automatically updated to today’s date),
the slide number (optionally starting from a higher number than 1), and
static text. There’s also an option to hide the footer on the title
slide.

Before this commit, none of that footer content was pulled through from
the reference doc: this commit supports all the functionality listed
above.

There is one behaviour which may not be immediately obvious: if the
reference doc specifies a fixed date (i.e. not automatically updating),
and there’s a date specified in the metadata for the document, the
footer date is replaced by the metadata date.

- Include date, slide number, and static footer content from reference
  doc
- Respect “slide number starts from” option
- Respect “Don’t show on title slide” option
- Add tests
2021-09-18 09:55:45 -07:00